Publikasjonsdetaljer
Sammendrag: The EIMP project is funded by Danida and headed by COWI. The total project includes four components: · Coastal water monitoring (responsible VKI (Dansih Water Quality Institute) and COW) · Air pollution monitoring (responsible NILU) · Reference laboratory (responsible VKI) · Pollution sources (responsible COWI) An audit system is being implemented at the reference laboratory which will enable the laboratory to perform audits in the air pollution monitoring network. As an introduction to station audits a workshop was held.