Fant 9848 publikasjoner. Viser side 332 av 394:
2023
2019
2014
Case study protocol. Air4EU - Air Quality Assessment for Europe: from local to continental scale. Air4EU-D6.1: Protocols for implementation of case studies.
2006
Case study Oslo II: Data assimilation in open road line source modelling. Poster presentation. NILU PP
2006
Case study of the Nidaros Cathedral in Trondheim. NILU OR
The Nidaros Cathedral has been used as a case study for the "Reach Management System". The two main contributions to the management system has been to obtain direct cost values for maintenance and repair for a historic important building. The second contribution has been on indirect cost, since a willingness to pay study has been performed for the Cathedral. The results from the willingness to pay duly exceeded the average annual budget for the Cathedral with a factor 5.
2001
2003
2001
2000
2012
2020
2014