Fant 2241 publikasjoner. Viser side 76 av 225:
Abu Dhabi Ports Company has procured two fixed Air Quality Monitoring Stations, one situated in Area A of KIZAD outside of the ADPC Site HQ building (ADPC Site Office station) with the other in Khalifa Port (ADPC Port station) adjacent to the EMAL conveyer. NILU UAE commissioned these two sites in December 2012 and has been operating them since then. The results presented in this report have been based upon air quality and meteorological data collected from these two fixed Air Quality Monitoring stations during the reported month.
2013
Abu Dhabi Ports Company has procured two fixed Air Quality Monitoring Stations, one situated in Area A of KIZAD outside of the ADPC Site HQ building (ADPC Site Office station) with the other in Khalifa Port (ADPC Port station) adjacent to the EMAL conveyer. NILU UAE commissioned these two sites in December 2012 and has been operating them since then. The results presented in this report have been based upon air quality and meteorological data collected from these two fixed Air Quality Monitoring stations during the reported month.
2013
Non-target screening - a powerful tool for selecting environmental pollutants. NILU OR
The main goal with this project was to test the potential and practicalness of the available non-target screening methods for identification of unknown or new emerging environmental pollutants. It was also desired to try to estimate the quantity of the identified compounds.
2013
2013
Fjernvarmesentral i Torshavn. Vurdering av beregninger. NILU OR
NILU har gjennomført enkle kontrollberegninger og gjennomgått to separate notater/rapporter vedrørende belastning av luftforurensning ved en planlagt fjernvarmesentral på Færøyene. NILU slutter seg til konklusjonen trukket av H.R. Olesen om at en 20 m høy skorstein vil overholde dansk regelverk for utslipp og konsentrasjon
2013
Air implementation pilot- Lessons learnt from the implementation of air quality legislation at urban level. EEA report, 7/2013
2013
Air implementation pilot: Management practices (update 2013). ETC/ACM Technical Paper, 2013/7
2013
Air implementation pilot: Workshop on measures, Copenhagen, February 27th 2013. ETC/ACM Technical Paper, 2013/5
2013
Air implementation pilot: Assessing the modelling activities. ETC/ACM Technical Paper, 2013/4
2013